
FD-410 | IFS Food 8 — Traceability Module
€59.00 one-time payment
IFS Food Version 8 — Traceability Module (Section 4.18, KO N° 7) WHAT'S INCLUDED - FD-410 Process Description (Word) — the full written procedure, built on the IFS Food 8 requirements - FD-410-F Flowchart (Word) — one page: risks & controls, roles, inputs/outputs, indicators - FD-410-WI Work Instruction (Word) — practical steps and common audit pitfalls - FD-410-LOG Traceability Register + QM-MRT Mock Recall & Traceability Test Log (Excel) — trace time, mass balance, Pass/Fail - Getting Started Guide (PDF) HOW IT WORKS Record lots at each step; run the annual test against the clock; the log calculates duration and mass balance and flags results outside your targets. FILE DETAILS Word (.docx) + Excel (.xlsx), fully editable, no macros. English. Instant download. Part of the complete IFS Food 8 QMS Template Pack (24 modules). Note: Odoino templates written in Odoino's own words - they do not reproduce or replace the IFS Food standard. IFS is a trademark of IFS Management GmbH; Odoino is not affiliated with IFS.
The problem this solves
KO N° 7 asks for traceability from raw material and food contact packaging lots through every step, incl. rework, to the customer — and the yearly test must show it within four hours with a mass balance. This module gives you the procedure and two Excel tools to prove it.
What’s included
- FD-410_Traceability_IFS_Food_8.zip — ZIP Archive, 348.2 KB
Who it’s for
Operations leads keeping a process or department running smoothly, small business owners who feel the absence of the structure larger companies take for granted, and independent consultants who need their own work to look and run as organized as a larger team’s — anyone who’s tired of rebuilding the same weekly tracking structure from scratch for each new project.
How it’s used
At the start of each week, open the tracker and run through five questions before filling it in: what’s still genuinely unfinished from last week, what’s predictably recurring versus what’s actually new, which single task causes real downstream cost if it’s missed, who else a given task touches, and what “done” looks like by the end of the week. Log each task with its owner, priority, and status, and update status as the week moves — the included Instructions sheet walks through this in full.
Preview


Trust elements
- License
- Personal and single-business use license. See the full License Agreement at /legal/license.
- Current version
- v1.0 — Initial release.
FAQ
No product-specific questions have come up yet — see the site FAQ or contact us.
Related products
CAPA & Audit Findings Tracker — Excel
Excel CAPA tracker: log every nonconformity with correction, root-cause corrective action, due date and effectiveness check — live dashboard, overdue alerts and 9 color themes.

Calibration Register & Check Log — Excel
Excel calibration register: every measuring device with interval and next due date, plus a check log with deviation and automatic Pass / Fail — dashboard and 9 color themes.

Cleaning & Sanitation Schedule — Excel
Excel master cleaning schedule: tasks with chemical, dosage and contact time, automatic next due dates, visual and ATP verification with Pass / Fail — dashboard and 9 color themes.
